Build & Migration
MHA Solutions designs, builds, commissions and migrates data centres and server rooms across Saudi Arabia — power, cooling coordination, racks, containment, structured cabling, security and the electrical works, delivered by one engineering team under one contract. From a single equipment room to a full data hall, and from a new build to a migration out of a facility that has outgrown itself. Most data centre and server room projects in this market are assembled rather than delivered. A mechanical contractor handles the cooling, an electrical contractor handles the power, an IT integrator handles racks and cabling, and an equipment supplier provides the UPS and generator. Each does their own scope competently. The client is left managing the boundaries between them. That is where the problems live. The cooling was designed for the day-one load and the racks arrived carrying more. The UPS is installed but the changeover was never tested under load because testing it needed two contractors on site at once and nobody owned that. The containment cannot be fitted because the cable containment went in first and is in the way. And when something underperforms at handover, four parties can each demonstrate that their own scope was delivered correctly. We work differently because we hold all of it. Critical power, generators, transformers and electrical distribution. Racks, containment and power distribution. Structured cabling. Servers and networking. CCTV and access control. Load bank testing and commissioning. And the electrical contracting capability to install it. That means the design is done once, as one system, and the commissioning proves the facility works as a whole rather than proving that each part works in isolation. We work at every scale. Most of what we do is not hyperscale — it is the twelve-rack room behind a hospital, the equipment room for a water treatment plant, the consolidated facility replacing four ageing server cupboards across a campus. Those projects deserve the same engineering discipline as a large build, and they rarely get it.
Assessment of an existing data centre or server room: actual density and headroom across power, cooling, space and connectivity; intake temperatures and airflow behaviour; single points of failure; which components cannot be serviced without an outage; and monitoring coverage. Delivered as a prioritised improvement plan rather than a list of faults.
Density profiling and growth horizon, cooling approach selection, electrical design through the whole power train, rack layout and containment, cabling architecture, and a modular build plan so capacity is installed in stages rather than all at once.
UPS, generators, transformers, distribution and rack power — sized as one chain, installed with the electrical works, and commissioned together rather than as separate deliveries.
Cooling capacity and redundancy design, containment, airflow management and heat rejection planning, coordinated with the mechanical scope so that the electrical, cooling and IT designs are consistent with each other.
Cabinets, aisle containment, power distribution, structured copper and fiber cabling, patching and labelling, all designed so the cabling does not obstruct the airflow it shares the room with.
CCTV, access control at room and cabinet level, and environmental monitoring — delivered as part of the same project rather than as a separate contract.
Staged commissioning through to full integrated systems testing under simulated load, with failure and recovery scenarios run deliberately, and the complete test record issued as handover documentation. Load banks and engineers provided by us.
Discovery and dependency mapping, move group planning, sequencing with rollback positions, physical decommissioning and installation, recabling, controlled power-up and structured post-move validation.
Environmental and power monitoring at rack level, alarming that reaches someone out of hours, and capacity reporting across all four dimensions so expansion can be planned rather than triggered.
Maintenance across the whole facility — UPS and batteries, generators, electrical distribution, cooling coordination, racks, cabling and security — under one contract, with annual load bank testing to confirm the facility still performs as commissioned. See our IT AMC and support contracts.
Talk to MHA Solutions for expert advice on Power, IT, and Security systems that fit your space. We cover Riyadh, Jeddah, Dammam, and other cities with custom plans.
Everything a data centre draws in electrical power comes back out as heat, and all of it has to be rejected to the outside. In a climate where outside is 45°C for a significant part of the year, that is the central engineering challenge of the facility — and it is where most of the capital cost and most of the running cost sit. It is also where the risk concentrates. Cooling redundancy is not a refinement in this climate. A room that loses its cooling in a Saudi summer does not have hours before equipment is at risk; depending on density, it has minutes. That makes N+1 cooling — enough capacity to carry the full load with one unit out of service — a baseline requirement rather than an upgrade, and it makes automatic changeover and out-of-hours alarming part of the design rather than an addition. The approaches, in order of increasing density:
.png)
Works at lower densities. Hot and cold aisle arrangement, blanking panels in every unused rack space, sealed cable entries and unobstructed airflow paths. These cost almost nothing and are routinely absent, and their absence is the most common reason a room underperforms its design.
Lower densities
.png)
Physically separates the hot and cold air streams with doors and roof panels, so the cooling handles a genuinely hot return rather than a diluted one. It raises the density a room can support and makes the cooling plant work more efficiently at the same time.
Higher densities
.png)
In-row units or rear-door heat exchangers place the cooling capacity beside the load. Where density is high enough that no amount of room-level air movement will work, this is the answer.
Cooling capacity beside the load
Hospital data centres and distributed equipment rooms supporting clinical systems and imaging archives, where availability requirements are absolute and the facility has to be maintained without interrupting care.
Consolidated facilities with documented commissioning, audit-ready records and framework compliance obligations attached to the infrastructure as much as to the systems.
High availability facilities with genuine dual-path design, tested failover, and recovery objectives that have been proven rather than assumed.
Plant data centres and control room infrastructure, frequently in environments that are hotter and dustier than a purpose-built facility, requiring specification against the actual conditions.
Control and SCADA infrastructure at treatment works and operational centres, often with remote sites feeding back to a central facility.
Exchange and transmission facilities, DC power plant, and high-density equipment rooms.
Campus data centres consolidating distributed server rooms, with research computing loads that are dense and intermittent.
Central facilities with edge rooms at branches and remote locations, designed and maintained to a consistent standard across the estate.
The first question in a data centre design is not how many racks you need or how large the room is. It is how much power each rack will draw — because that figure, expressed in kilowatts per rack, determines almost every decision that follows.
Power density sets the cooling approach. A room running a few kilowatts per rack can be cooled at room level with conventional units and good airflow discipline. Higher densities need aisle containment to stop hot and cold air mixing. Higher again, and room-level cooling cannot physically move enough air — the cooling has to move closer to the load, using in-row units or rear-door heat exchangers. These are fundamentally different designs, and the difference is not something you retrofit easily.
Density also sets the electrical design: circuit sizing to each rack, distribution board capacity, UPS sizing, and how power is brought to the row. And it sets the physical design: rack spacing, containment, and how much of the floor area is actually usable.
The mistake we see most often is a room designed for an average density that never existed. Racks are rarely uniform — a few carrying dense compute alongside many carrying light network and storage equipment. Designing for the average leaves the dense racks under-cooled and under-powered, and they are usually the ones that matter most. Design should account for the distribution of load, not just its total.
The second mistake is designing for day one. A facility built exactly to current requirement has no capacity for growth, and expanding a live data centre is dramatically more expensive and more disruptive than building the capability in. The usual answer is a modular approach: infrastructure sized for the design-day capacity with the equipment installed in stages as the load grows. You build the room, the electrical capacity and the cooling capability for where you are going, and populate it progressively.
We establish the density profile and the growth horizon before anything else, and we will tell you where a room you already have cannot support what you are planning to put in it — which is a conversation worth having before the equipment is ordered rather than after.
Every data centre has a chain of equipment between the utility supply and the server, and the facility is only as available as the weakest link in it. That chain typically runs: incoming supply, transformer, main switchboard, changeover arrangement, generator, uninterruptible power supply, distribution, rack power distribution, equipment.
Each element has to be sized against the others, and mismatches at the boundaries are common. A generator undersized relative to the UPS input will fail to support it when it matters. A UPS whose input harmonics the generator cannot tolerate produces a facility that works on mains and fails on backup — the worst possible failure mode, because it only appears during the event it was built for. Cooling frequently gets left off the generator entirely, which means the facility rides through an outage on battery until the room overheats.
Battery autonomy needs to be sized against what it is bridging to. If a generator starts reliably, a few minutes is sufficient. If there is no generator and the requirement is to stay up for an hour, the battery installation changes scale dramatically — and at that point a generator is almost always both cheaper and more reliable.
Redundancy needs to be honest. A design described as redundant frequently has a single point of failure hiding in it: one changeover switch, one distribution board, one cable route carrying both supposedly independent paths. Genuine dual-path design means two separate paths maintained all the way to the rack, and equipment with dual power supplies connected to both — not two cords into the same strip. Single-corded equipment needs a transfer arrangement to sit across the two paths, or it becomes the single point of failure in an otherwise dual-path facility.
We design and install the whole chain, including the electrical works, and we commission it as one system — which is the only way to find the mismatches at the boundaries before they find you.
Two further points specific to operating here. Outdoor condensers and heat rejection plant accumulate dust, and a fouled condenser loses capacity progressively and quietly — so cleaning schedules need to reflect the actual environment rather than a manufacturer default. And where chilled water systems are used, water treatment and availability need planning properly rather than assuming.
Finally: cooling must be on the generator. A facility that rides an outage on UPS battery while the room temperature climbs has not solved the problem, it has deferred it by a few minutes.
Availability discussions usually focus on what happens during a failure. The more practical question, and the one that determines how a facility behaves over years, is what happens during maintenance.
A concurrently maintainable facility is one where any single component — a UPS, a cooling unit, a distribution board, a circuit — can be taken out of service for maintenance or replacement without shutting down the load. A facility that is not concurrently maintainable requires a planned outage every time anything needs servicing, which in practice means the maintenance does not get done. Batteries are not replaced on schedule, cooling is not serviced properly, and the facility degrades until something fails on its own terms.
This is why concurrent maintainability is usually a more valuable property than fault tolerance for most organisations. Fault tolerance protects against an unplanned failure of any single component. Concurrent maintainability lets you look after the facility so that failures are less likely in the first place. The industry tier classifications describe both, but if you have to choose one to build toward, concurrent maintainability delivers more day-to-day value.
Achieving it means designing in the bypass arrangements, isolation points and redundant paths that allow work to be done safely on a live facility — and then testing those arrangements at commissioning rather than discovering during the first maintenance window that the bypass has never been operated.
We design for it, and where we assess an existing facility we will tell you plainly which components cannot currently be serviced without an outage.
A data centre is a set of systems that have to work together under conditions that will not occur until the day they matter. Commissioning is the process of creating those conditions deliberately, while there is still time to fix what does not work.
It proceeds in stages. Equipment is verified at the factory where the project warrants it, and again on delivery. Individual components are checked for correct installation before energisation. Each system is then tested on its own — the UPS, the generator, the cooling, the switching and changeover arrangements — against its design intent.
The stage that matters most is the last one, and it is the one most often reduced when a programme slips. Integrated systems testing puts the entire facility under simulated load and then deliberately fails parts of it. Utility supply is cut. The generator starts, the UPS carries the gap, and the cooling recovers — or it does not. Individual cooling units are taken offline to confirm the remaining capacity holds. Transfer arrangements are operated under load. Failure and recovery scenarios are run in sequence.
This is where design assumptions meet reality, and it routinely finds things that no amount of individual system testing would have: a generator that starts but cannot support the cooling inrush, a transfer that works on no load and drops on full load, a room that holds temperature until the second cooling unit is taken out, a monitoring alarm that never reaches anyone.
The load is created using load banks, which is how you test a facility that has no IT equipment in it yet — and it is the only honest way to prove capacity before go-live. We provide the load banks and the engineers, and we issue the full test record with the recorded readings at each step.
That documentation is what goes into the handover file, what supports a certification submission where one is being pursued, and what gives you a baseline to test against in future years.
Data centre migrations fail on planning rather than on execution. The physical work of moving equipment is the straightforward part; establishing what can move when, and what will break if it moves in the wrong order, is where projects come undone.
It starts with discovery. Most organisations have a less complete picture of their own environment than they expect — undocumented servers, forgotten dependencies, applications that rely on something nobody has thought about in years, and a physical estate that has drifted from the records. A proper discovery exercise establishes what is actually there, what talks to what, and which systems cannot be separated.
Those dependencies determine the move groups. Systems that depend on each other move together, or one of them stops working the moment the other is unplugged. Getting this wrong is the most common cause of a migration that overruns its window.
From there the plan covers the sequence, the downtime window for each group, what gets communicated to users and when, and — critically — a rollback position for each stage. A migration step you cannot reverse is a migration step you should not take. Knowing the point at which you would abandon and revert, and having the ability to do it, is what keeps a difficult night from becoming a multi-day outage.
Physical execution covers decommissioning, transport with appropriate handling, installation in the target facility, recabling, and power-up in a controlled order. Where the target facility is new, it should be commissioned and proven before anything is moved into it — moving production equipment into an unproven room is a risk that is entirely avoidable.
Validation afterwards is the stage most often cut short. Systems that come up are not necessarily working correctly, and problems that appear a week later are considerably harder to attribute. Structured post-move testing against a defined checklist is part of the job.
We plan and execute migrations, and we can build and commission the target facility as part of the same programme.
A facility that is not monitored is one you find out about after something has happened. The monitoring worth having answers three questions.
Temperature sensors at rack intakes — not a single room reading, which averages away the hot spot that matters — plus humidity, leak detection under cooling plant and at pipework, and door status. Alarms have to reach someone who can act, including at three in the morning, because cooling fails at night as readily as during the day.
Metering at circuit and rack level tells you actual draw against capacity. Without it, capacity planning is guesswork: either racks are left half-used because nobody is confident, or a circuit trips and the answer arrives the hard way. Per-rack metering also makes it possible to attribute consumption where that matters.
Capacity in a data centre has four dimensions — power, cooling, physical space and connectivity — and they are consumed at different rates. A room can have plenty of floor space and no cooling headroom, or spare cooling and no free circuits. Knowing which constraint you will hit first, and when, is what turns expansion into a planned project rather than an emergency.
We install monitoring as part of the build and can retrofit it to existing facilities, which is frequently the most useful first step when a room is behaving unpredictably and nobody knows why.
Most of the rooms we work on are not data halls. They are equipment rooms with somewhere between three and twenty racks, supporting a hospital, a plant, a campus, a bank branch network or a head office. They matter just as much to the organisation that depends on them, and they are typically engineered far less carefully.
The usual history is the same. A room was set up years ago for a handful of servers, and equipment has been added ever since without the cooling, the power or the airflow being revisited. It works, mostly. It runs hotter than it should in summer. Nobody is certain what is on which circuit. There is one air conditioning unit. And the UPS batteries are of unknown age.
The engineering principles are exactly the same at this scale — density, cooling capacity and redundancy, honest power design, airflow discipline, monitoring, and the ability to maintain it without shutting it down. The solutions are smaller and considerably cheaper, and the improvement is usually substantial.
Frequently the most valuable first step is an assessment: what the room can actually support, where it is currently constrained, what would fail first, and what a realistic improvement plan looks like in priority order. That is a short piece of work and it often prevents a much larger and less necessary spend.
We also consolidate — organisations with server cupboards scattered across a campus or several sites often find that one properly built room costs less to run and considerably less to look after than five improvised ones.
We design, build, commission and maintain data centres and server rooms Kingdom-wide from our base in Jeddah — Riyadh, Dammam, Khobar, Jubail, Yanbu, Makkah, Madinah, Taif and remote industrial and infrastructure sites. Design, installation, commissioning and testing are carried out by our own engineers.
Start with power density per rack rather than floor area or rack count, because that figure determines the cooling approach, the electrical design and the physical layout. Also establish the distribution of load — most rooms have a few dense racks alongside many light ones, and designing for the average leaves the dense ones under-cooled. Then set a growth horizon, because building exactly to current requirement means expanding a live facility later, which is dramatically more expensive and disruptive.
Cooling, by a considerable margin. Everything the facility draws in power comes back out as heat and has to be rejected to an outside that is 45°C for much of the year. That drives the capital cost, the running cost and the risk profile. It also makes cooling redundancy a baseline requirement rather than an upgrade — a room that loses cooling in a Saudi summer has minutes before equipment is at risk, not hours.
It depends on density. At lower densities, room-level cooling with disciplined airflow — hot and cold aisle arrangement, blanking panels in every unused rack space, sealed cable entries — works perfectly well and costs almost nothing. Containment becomes necessary as density rises, because it stops hot and cold air mixing and lets the cooling handle a genuinely hot return. Beyond a certain density, no amount of room-level air movement is sufficient and the cooling has to move beside the load.
It is the final commissioning stage, where the whole facility is put under simulated load and parts of it are deliberately failed — the supply is cut, the generator starts, the UPS carries the gap, cooling units are taken offline — to prove the systems work together rather than individually. It routinely finds things nothing else would: a generator that cannot support the cooling inrush, a transfer that drops under full load, a room that holds temperature until the second cooling unit goes. For any facility you intend to rely on, yes.
With load banks. They create a controlled, measurable electrical load equivalent to the IT load, which lets the full power and cooling chain be proven at design capacity before anything is moved in. It is the only honest way to confirm the facility will carry its rated load, and the results are documented as part of the handover record.
It means any single component — a UPS, a cooling unit, a distribution board — can be taken out of service for maintenance without shutting down the load. It matters more than most people expect, because a facility that is not concurrently maintainable requires an outage every time anything needs servicing, which in practice means the servicing does not happen. Batteries do not get replaced, cooling does not get serviced, and the facility degrades until something fails on its own terms.
Only if they were sized and tested as a pair. Common mismatches: a generator undersized relative to the UPS input, a generator that cannot tolerate the harmonic current the UPS draws, or cooling that was left off the generator entirely — which means you ride the outage on battery while the room heats up. These produce a facility that works on mains and fails on backup, which is the worst possible failure mode because it only appears during the event it was built for. Load bank testing the combination is how you find out.
Planning, almost always — rarely the physical move. The most common failure is incomplete discovery: undocumented systems, forgotten dependencies, applications relying on something nobody has considered in years. Those dependencies determine which systems must move together, and getting the move groups wrong is what causes a migration to overrun its window. Every stage also needs a rollback position, because a step you cannot reverse is a step you should not take.
No — most of what we do is at that scale. Rooms with three to twenty racks supporting a hospital, a plant, a campus or a head office matter just as much to the organisations that depend on them, and they are typically engineered far less carefully than a large build. The principles are identical; the solutions are smaller and much cheaper. An assessment is usually the best starting point, and it often prevents a larger and less necessary spend.
Yes. We work as the delivery contractor on designs produced by consultants, and we will raise anything in the design that we think will cause a problem before it is built rather than after. We also take on existing facilities for assessment, remediation, expansion and ongoing maintenance regardless of who built them.
For a new facility, tell us the density you need, the growth horizon and where it is going, and we will design it. For an existing room, an assessment will tell you what it can actually support, where it is constrained and what would fail first — which is usually the most useful thing anyone can tell you before you spend money on it.
Most facilities in the Kingdom deal with separate suppliers for power, IT and security, then discover the gaps between them at the worst possible moment. The UPS vendor points at the electrical contractor. The IT supplier says the rack was never their scope. Nobody owns the problem.
MHA Solutions covers all four disciplines with one engineering team. That means one point of accountability for the UPS, the distribution board feeding it, the server rack it protects and the access control system on the door of the room.
We work with industrial plants, healthcare facilities, government entities, data centres, telecom operators and major infrastructure contractors across Saudi Arabia. Our engineers handle the full lifecycle: site survey and load study, system design and specification, supply, installation, testing and commissioning, and ongoing maintenance under contract.
Equipment that performs well in a temperate climate does not always survive a Saudi plant room. Ambient temperatures above 45°C shorten battery life, airborne dust clogs filters and cooling paths, and salt-laden humidity on the Red Sea coast attacks enclosures and terminations. We specify for those conditions from the start, because replacing equipment early is far more expensive than sizing it correctly on day one.
Discover Our JourneyHappy customers
Brand partnerships
Years in business
Countries Served

Explore engineered solutions for mission-critical environments across power, IT and security.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.