Professional Power System Testing Solutions
MHA Solutions provides resistive and reactive load bank rental and supervised load testing across Saudi Arabia, for generator commissioning, UPS and battery verification, data centre integrated systems testing and annual maintenance testing. Every test is documented in a full engineering report suitable for project handover. A standby power system is a promise. Until it has been tested under real load, that is all it is. Most facilities exercise their generator regularly, and most exercise it off-load or on whatever the building happens to be drawing at the time. That confirms the engine starts. It confirms very little else. It does not tell you whether the set will hold voltage and frequency when a large step load is applied, whether the cooling system copes at full output in July, whether the alternator can deliver its rated kVA rather than just its rated kW, whether the transfer arrangement actually works, or whether the fuel system will sustain a run of any length. A load bank answers all of those questions. It applies a controlled, measurable, adjustable load to the system so its actual performance can be recorded rather than assumed — and it does so on a Tuesday morning with engineers present, rather than at two in the morning during an unplanned outage. We provide load banks for rental to clients running their own tests, and a full supervised testing service with our engineers on site, the test protocol agreed in advance, and a written report on completion. We test generators, UPS systems, battery banks, transformers and complete data centre power trains, at capacities from small telecom installations up to full facility loads. The report matters as much as the test. For project handover, insurance, regulatory compliance and Tier certification, a documented set of recorded results is what is actually required. A test with no report is an opinion.
Two ways to work with us, depending on whether you have the engineers and the appetite to run the test yourself.
We deliver, position and connect the equipment, brief your team on operation, and collect it afterwards. You run the test. This suits contractors and facilities teams with in-house capability who need the equipment rather than the expertise.
Our engineers attend, agree the protocol with you beforehand, connect and operate the equipment, run the test, record the results and issue the report. You get a documented outcome rather than a piece of equipment. This is what most commissioning and handover work requires, and it is what we would recommend for any acceptance test.
Where a facility needs regular testing — a data centre, a hospital, a critical industrial site — a permanently installed load bank connected into the distribution system removes the mobilisation cost and logistics from every future test. Worth considering if you are testing more than once or twice a year.
Talk to MHA Solutions for expert advice on Power, IT, and Security systems that fit your space. We cover Riyadh, Jeddah, Dammam, and other cities with custom plans.
.png)
Resistive load banks apply a purely resistive load at unity power factor, converting electrical energy directly into heat. Rated in kW, they test the prime mover — engine output, cooling capacity, exhaust performance and fuel system behaviour under sustained full load. This is the workhorse of load testing and the correct choice for routine annual generator exercising, wet stacking prevention, and any test where the objective is to load the engine properly. Available air-cooled, in portable and skid-mounted formats.
Rated in kW · unity power factor
.png)
Reactive load banks apply an inductive or capacitive load, rated in kVAR, simulating the reactive component that motors, transformers and electronic power supplies draw in real service. Used alongside a resistive bank, they allow testing at a realistic power factor — normally 0.8 lagging — which is what proves the alternator, the excitation system and the automatic voltage regulator. Used alone, they are valuable for transformer testing, power factor correction verification and motor starting simulation.
Rated in kVAR
.png)
A combined unit provides both kW and kVAR from a single load bank with an adjustable ratio between them, allowing the full kVA rating of a set to be tested at its design power factor. This is the correct configuration for generator acceptance testing, hospital and data centre commissioning, and any situation where the requirement is to prove rated kVA rather than rated kW. It also simplifies the site logistics considerably compared with mobilising two separate banks.
kW and kVAR · adjustable ratio
.png)
DC load banks discharge battery systems under controlled, measured conditions to establish actual remaining capacity rather than assumed capacity. This applies to UPS battery banks, telecom DC plant, switchgear tripping batteries and solar storage. It is one of the most valuable tests available on any critical installation, because battery capacity degrades gradually and silently — a bank showing a perfectly normal float voltage can deliver a fraction of its rated autonomy.
Controlled, measured battery discharge
Integrated systems testing before go-live, UPS and battery verification, cooling validation at design load, and the documented results required for Tier certification submissions.
Hospital standby plant where the generator carries life-safety and critical care loads, and where periodic documented load testing is both a regulatory expectation and simple prudence.
Emergency generator and distribution testing at plants and refineries, working within permit-to-work systems and site access constraints.
Treatment works and pumping stations, frequently unmanned and remote, where the standby set is the only thing between a failure and an interruption to supply. We have carried out testing for the National Water Company.
DC plant and battery capacity testing at base stations and exchanges, where battery performance in heat is the governing risk.
Commissioning and periodic testing of backup systems protecting production lines, where an unplanned stop is measured in lost output rather than inconvenience.
Site acceptance testing and handover documentation on new-build projects, working to the main contractor's specified commissioning protocol.
Most generator load testing carried out in the region uses a resistive load bank alone. That is a genuinely useful test, and it is far better than no test. It verifies that the engine can produce its rated kW, that the cooling system holds temperature at full output, that the exhaust and fuel systems perform, and that the set runs hot enough to burn cleanly.
What it does not properly test is the alternator.
Generator sets are rated at 0.8 power factor lagging. A resistive load bank applies load at unity power factor — pure kW, no reactive component. That means the alternator's excitation system and automatic voltage regulator are never loaded the way they will be in service, because real building loads are not resistive. Motors, transformers, fluorescent and LED drivers and UPS input stages all draw reactive current.
The practical consequence is that a set can pass a resistive-only test at its full kW rating and still fail to hold voltage when it meets the reactive load of the actual installation. The engine was proved. The alternator was not.
A full acceptance test therefore uses resistive and reactive load banks together, loading the set at its rating power factor. This is the only way to verify that the machine delivers its rated kVA rather than only its rated kW, and it is the only way to see how the voltage regulator behaves under a realistic step load.
If you are commissioning a generator and the test protocol you have been offered is resistive-only, it is worth asking why. There are situations where it is the right call — a routine annual exercise to prevent wet stacking does not need reactive load — but a factory or site acceptance test for a new installation generally does.
We carry both, and we will tell you which your situation actually needs rather than quoting the larger package by default.
Full site acceptance testing of new generator installations — step load tests, sustained full load runs, voltage and frequency stability, cooling performance, transfer and changeover verification, and reactive load testing at rating power factor.
Scheduled load testing of standby installations to verify continued performance and to burn off the effects of prolonged light-load running. Documented results year on year also show performance trends, which is how you spot a set that is degrading before it fails.
Verifying that a UPS delivers rated output and that the battery bank actually provides its design runtime at the design load. This is the test that most often produces an unwelcome surprise, and far better to have it during commissioning than during an outage.
Controlled timed discharge of battery banks to establish real remaining capacity against the rated figure, for UPS, telecom DC plant and switchgear batteries.
Simulating the full IT and cooling load before go-live, to verify UPS, generators, switchgear, transfer schemes and cooling as an integrated system rather than as separate pieces of equipment that were each tested alone. This is the stage where design assumptions meet reality.
Loading transformers and distribution equipment to verify performance, thermal behaviour and protection coordination under real conditions.
Proving that automatic transfer switching operates correctly under genuine load — a step that is skipped surprisingly often, and a common point of failure in otherwise well-built installations.
Using load banks as a controlled heat source to verify that data centre and plant room cooling performs at design load, including under partial failure scenarios.
Load testing is not simply a matter of applying load until something happens. A meaningful test follows a protocol, records defined parameters at defined intervals, and produces a result that can be assessed against a standard.
NFPA 110, the standard for emergency and standby power systems, is the reference most commonly cited for standby generator testing. It sets out requirements for periodic exercising under load and provides for supplemental load bank testing where routine exercising does not load the set sufficiently — which, in most buildings, it does not.
ISO 8528-6 covers test methods for generating sets and underpins factory and site acceptance testing.
Uptime Institute Tier certification requires integrated systems testing of the complete power and cooling infrastructure at design load. Load banks are how that load is created, and the test documentation forms part of the certification submission.
IEEE 450 and IEEE 1188 cover capacity testing for vented and valve-regulated lead-acid batteries respectively, and define how a discharge test should be conducted and assessed.
Beyond the standards, most Saudi infrastructure and government projects carry their own commissioning and handover requirements, and main contractors frequently specify load testing as a condition of acceptance. We work to the specified protocol where one exists, and we will propose one where it does not.
A load test that produces no documentation is of limited use. You cannot submit it for handover, you cannot show it to an insurer, you cannot compare this year against last year, and you cannot demonstrate compliance with it.
Every test we carry out is documented. A report covers the equipment tested and its nameplate data, the test protocol and load steps applied, recorded readings of voltage, frequency, current, power factor and temperature at each step, ambient conditions during the test, observations and any anomalies noted, and clear conclusions with recommendations where corrective action is needed.
That report is what goes into your handover file, your maintenance records or your Tier certification submission. It is also what tells you something useful the following year: a set whose recorded performance has shifted between annual tests is telling you something long before it fails.
Where the client or the main contractor has a specified test protocol and reporting format, we work to it. Where there is none, we propose one appropriate to the equipment and the purpose of the test, and agree it before we mobilise — so there is no argument afterwards about whether the test proved what it needed to prove.
Load testing anywhere in the Gulf brings practical constraints that a temperate-climate method statement does not anticipate.
A load bank converts everything you put into it into heat. A 500 kW resistive bank rejects 500 kW of heat into wherever it is standing. Indoors, in a plant room, that is not a minor consideration — and outdoors in a Saudi summer, with ambient already above 45°C, the discharge air has to go somewhere that does not recirculate back into the load bank intake or into the generator radiator. Placement, ducting and airflow are part of the test planning, not an afterthought on the day. We survey the location before mobilising.
A generator that passes a full load test comfortably in January may not deliver the same output in July, because engine output falls as intake air temperature rises. If the purpose of the test is to prove the set will carry the load in summer conditions, then testing in winter and recording a pass is not proof of very much. Where it matters, we say so and recommend testing in conditions representative of the worst case — or at minimum record the ambient conditions in the report so the result can be interpreted properly.
Extended full-load running in dusty conditions loads air filtration hard, on both the generator and the load bank. A test that runs for several hours in the Eastern Province is a genuine workout for the intake system, which is useful information in itself.
Load banks are heavy and often need crane access, and remote industrial sites, refineries and infrastructure projects come with permit-to-work requirements, induction procedures and restricted working windows. We plan mobilisation around those rather than discovering them on arrival.
Capacity range: On request
Typical use: Generator load testing, wet stacking prevention, annual exercising
Capacity range: On request
Typical use: Alternator and AVR verification, transformer testing, power factor work
Capacity range: On request
Typical use: Generator acceptance testing at rating power factor, data centre IST
Capacity range: On request
Typical use: UPS and telecom battery capacity testing
We mobilise load banks and testing engineers Kingdom-wide from our base in Jeddah — Riyadh, Dammam, Khobar, Jubail, Yanbu, Makkah, Madinah, Taif, Abha, NEOM and remote industrial and infrastructure sites. Testing is carried out by our own engineers, and mobilisation is planned around site access, permit requirements and working windows agreed in advance.
A load bank is a device that creates an artificial, controlled and measurable electrical load. It allows a generator, UPS, battery bank or transformer to be run at a known load so its actual performance can be recorded, without needing a real load to be present and without putting live equipment at risk. Resistive load banks convert the energy into heat; reactive load banks simulate the inductive or capacitive component of real-world loads.
Because the building load is whatever it happens to be that day, which is usually a small fraction of the generator's rating. That confirms the set starts and runs. It does not confirm it can carry full load, hold voltage and frequency under a step change, or cool adequately at full output. Prolonged light-load running on a diesel engine also causes wet stacking, where unburned fuel accumulates in the exhaust system and degrades performance over time.
A resistive load bank applies pure kW at unity power factor and tests the engine and cooling system. A reactive load bank applies kVAR and tests the alternator, excitation system and voltage regulator. A combined unit provides both with an adjustable ratio, allowing the set to be tested at its rating power factor — normally 0.8 lagging — which is the only way to prove full kVA output.
Generators are rated at 0.8 power factor lagging, but a resistive-only test applies load at unity power factor. That means the alternator and its voltage regulator are never loaded the way they will be in service, because real loads — motors, transformers, UPS input stages — draw reactive current. A set can pass a resistive-only test at full kW and still fail to hold voltage against the real reactive load of the installation. For an acceptance test, resistive and reactive together is the meaningful test.
Yes, on every test. The report covers the equipment tested, the protocol and load steps applied, recorded voltage, frequency, current, power factor and temperature at each step, ambient conditions, observations and conclusions with any recommendations. That documentation is normally what is actually required for project handover, insurance, compliance and Tier certification.
For a critical standby installation, annually at rated capacity is a reasonable baseline, alongside the routine monthly exercising that most facilities already do. NFPA 110 provides for supplemental load bank testing where routine exercising does not load the set sufficiently, which in most buildings it does not. Annual testing also builds a performance record year on year, which is how a slowly degrading set gets spotted before it fails.
Both. We rent equipment to contractors and facilities teams who have the capability to run the test themselves, with delivery, positioning, connection, a briefing and collection included. We also provide a fully supervised service where our engineers agree the protocol, operate the equipment, run the test and issue the report. For acceptance and handover testing we would normally recommend the supervised service.
Yes. We carry out controlled timed discharge testing on UPS battery banks to establish actual remaining capacity against the rated figure. This is one of the most valuable tests available on a critical installation, because battery capacity degrades gradually and invisibly — a bank showing normal float voltage can deliver a fraction of its rated runtime. Testing is the only way to know.
Into the surrounding air. A load bank converts everything applied to it into heat, so a 500 kW test rejects 500 kW of heat wherever the unit is standing. In Saudi summer conditions that needs planning — the discharge air must not recirculate into the load bank intake or into the generator radiator, or the test will be compromised and the equipment may trip on temperature. We survey the location and plan placement, ducting and airflow before mobilising.
Tell us what needs testing — a generator, a UPS, a battery bank or a complete facility — where it is, and when you need it done. We will agree the protocol, plan the mobilisation and come back with a quotation for rental or a fully supervised test.
Most facilities in the Kingdom deal with separate suppliers for power, IT and security, then discover the gaps between them at the worst possible moment. The UPS vendor points at the electrical contractor. The IT supplier says the rack was never their scope. Nobody owns the problem.
MHA Solutions covers all four disciplines with one engineering team. That means one point of accountability for the UPS, the distribution board feeding it, the server rack it protects and the access control system on the door of the room.
We work with industrial plants, healthcare facilities, government entities, data centres, telecom operators and major infrastructure contractors across Saudi Arabia. Our engineers handle the full lifecycle: site survey and load study, system design and specification, supply, installation, testing and commissioning, and ongoing maintenance under contract.
Equipment that performs well in a temperate climate does not always survive a Saudi plant room. Ambient temperatures above 45°C shorten battery life, airborne dust clogs filters and cooling paths, and salt-laden humidity on the Red Sea coast attacks enclosures and terminations. We specify for those conditions from the start, because replacing equipment early is far more expensive than sizing it correctly on day one.
Discover Our JourneyHappy customers
Brand partnerships
Years in business
Countries Served

Explore engineered solutions for mission-critical environments across power, IT and security.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.