Short and long-term generator rental for construction projects, planned shutdowns, events, seasonal demand and emergency cover, including fuel systems, cabling, distribution and on-site support. Generator rental: 10 kVA – 3,000 kVA · minimum 1 day · fuel, cabling and on-site support included. We supply, install, service and rent generators Kingdom-wide from our base in Jeddah — including Riyadh, Dammam, Khobar, Jubail, Yanbu, Makkah, Madinah, Taif, Abha and remote industrial and infrastructure sites. Installation, commissioning, load bank testing, scheduled servicing and emergency callouts are carried out by our own engineers on site. For permanent installations, see our diesel generators page.
Engine and alternator output both fall as intake air temperature rises, because hotter air is less dense and carries less oxygen. A set specified against a nameplate figure without checking the curve against a 45°C summer ambient is not going to deliver what the drawing says it will. We size against the actual site condition, not the catalogue.
Intake protection and shutdown philosophy both need thinking through for sites exposed to sustained blowing sand, particularly for prime-rated sets that cannot simply be stopped.
Day tanks, bulk storage, transfer pumps, level monitoring, bunding and fuel polishing. Fuel is where a great many installations quietly fail, and it deserves more design attention than it usually gets.
Talk to MHA Solutions for expert advice on Power, IT, and Security systems that fit your space. We cover Riyadh, Jeddah, Dammam, and other cities with custom plans.
.png)
Smaller sets on trailers or skids for site work, temporary events, emergency cover and jobs that move between locations. These are most often rented rather than bought.
Trailer or skid mounted
.png)
A generator built into an ISO container or a purpose-made shelter, complete with ventilation, fuel system, control panel and distribution. Containerised sets suit remote sites, temporary installations, projects with no plant room, and large capacities where building a room around the machine is slower and more expensive than delivering it ready to run. They are also relocatable, which matters on a construction programme that moves.
Ventilation, fuel system, control panel and distribution built in
.png)
An acoustic canopy encloses the set in sound-attenuating material and controls the exhaust and intake noise paths. This is what makes a generator acceptable next to a hospital ward, a hotel, a mosque or a residential block, and it is often a planning or municipal requirement rather than a preference.
Acoustic canopy — often a municipal requirement
Prime power for sites with no grid connection, and temporary power through the build programme. Rental usually makes more sense than purchase here, and sets need to be robust enough for site conditions.
Temporary power for exhibitions, conferences and outdoor events, where silent running and fast mobilisation matter.
Hospitals and clinics where transfer time, reliability and regulatory compliance are all non-negotiable, and where the generator has to carry life-safety and critical care loads without interruption.
Hotels, malls and office towers where acoustic performance and municipal noise limits shape the specification as much as the electrical requirement.
A generator's rating describes how it is permitted to be used, not just how much power it can produce. Prime rating is designed to run for an unlimited number of hours at a varying load, as the primary source of supply. This is what a remote site, a construction project or a facility without a reliable grid connection needs.
Using a standby-rated set as a prime power source is one of the most common and most expensive specification errors we see. It works — right up until the engine reaches an early overhaul it should not have needed.
Yes. UPS systems, diesel generators and load banks are available for rental as well as purchase, which suits planned shutdowns, data centre commissioning, construction projects, events and emergency cover. Rental includes delivery, installation, commissioning and collection.
Sizing depends on your total running load, the starting current of the largest motor on the system, whether the set is for standby or prime duty, and how much spare capacity you want for expansion. Motor starting is the factor most often underestimated — starting current can be several times running current, and a set sized only on running load will trip or produce a voltage dip that takes other equipment down with it. We carry out a load study before recommending a capacity.
Consumption is roughly proportional to load, and diesel engines are most efficient in the upper part of their load range rather than lightly loaded. Every manufacturer publishes a fuel consumption curve for the specific set at 25, 50, 75 and 100 per cent load, and that curve — not a rule of thumb — is what should drive your fuel storage sizing and running cost estimate. We provide the figures for the set we are quoting so you can plan tank capacity and refuelling logistics properly.
Yes. Acoustic canopies are standard on most of our range and are frequently a municipal or planning requirement rather than a preference — particularly near hospitals, hotels, mosques and residential areas. A canopy also protects the set from dust and sun, which extends life in Saudi conditions.
Tell us the load, the site, the duration and whether the set is for standby or prime duty. We will confirm a suitable set, fuel and cabling arrangements, and come back with a rental quotation.
Most facilities in the Kingdom deal with separate suppliers for power, IT and security, then discover the gaps between them at the worst possible moment. The UPS vendor points at the electrical contractor. The IT supplier says the rack was never their scope. Nobody owns the problem.
MHA Solutions covers all four disciplines with one engineering team. That means one point of accountability for the UPS, the distribution board feeding it, the server rack it protects and the access control system on the door of the room.
We work with industrial plants, healthcare facilities, government entities, data centres, telecom operators and major infrastructure contractors across Saudi Arabia. Our engineers handle the full lifecycle: site survey and load study, system design and specification, supply, installation, testing and commissioning, and ongoing maintenance under contract.
Equipment that performs well in a temperate climate does not always survive a Saudi plant room. Ambient temperatures above 45°C shorten battery life, airborne dust clogs filters and cooling paths, and salt-laden humidity on the Red Sea coast attacks enclosures and terminations. We specify for those conditions from the start, because replacing equipment early is far more expensive than sizing it correctly on day one.
Discover Our JourneyHappy customers
Brand partnerships
Years in business
Countries Served

Explore engineered solutions for mission-critical environments across power, IT and security.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.