Reliable Backup Power Solutions for Critical Operations
MHA Solutions supplies, installs, commissions and maintains diesel generator sets from 10 kVA to 2500 kVA across Saudi Arabia. We work with Perkins and Cummins engines, carry out the electrical works and fuel systems around the set ourselves, and support installations under maintenance contract once they are running. Our engineers have carried out generator testing at NEOM. A standby generator spends almost its entire life doing nothing. That is precisely the problem with it. Nobody notices a set that has quietly become unreliable — until the mains fails, and it either does not start at all, or starts, runs for four minutes, and shuts down on a fault that nobody knew was developing. Most generator failures are not dramatic. A battery that has lost cranking capacity in summer heat. A fuel supply that has degraded in storage. A coolant level nobody checked. An automatic transfer switch that has never actually been tested under load. Every one of those is preventable, and every one of them is found on a routine maintenance visit rather than during an outage. Specification matters just as much. A set sized only on running load will struggle or trip when a large motor starts, because starting current can be several times running current. A standby-rated set used as a prime power source will not last. And a generator installed without proper attention to ventilation, exhaust routing, fuel storage and earthing will underperform its nameplate regardless of how good the engine is. We size generators from a measured load study that accounts for motor starting, not from an equipment list. We specify the rating class against how the set will actually be used. We carry out the installation, the electrical works and the fuel system ourselves, so one team is accountable for the whole thing. And we maintain and load bank test the installation afterwards, because a generator that has never run at full load is an assumption rather than a backup. Our range covers 10 kVA sets for small commercial premises through to 2500 kVA plant for heavy industry and major infrastructure, for purchase and for rental.
We measure the actual load and, critically, the starting characteristics of the largest motor loads on the system. Motor starting is the factor most often underestimated: starting current can be several times running current, and a set sized only on running load will trip or suffer a voltage dip that takes other equipment out with it. The output is a sized specification with the rating class stated.
Diesel generator sets from 10 kVA to 2500 kVA with Perkins and Cummins engines.
Foundations and anti-vibration mounting, ventilation and heat rejection, exhaust routing and silencing, cabling and termination, earthing, changeover and distribution. Because we hold electrical contracting capability in-house, the machine and the installation around it are one scope rather than two contracts that meet somewhere in the middle.
Day tanks, bulk storage, transfer pumps, level monitoring, bunding and fuel polishing. Fuel is where a great many standby installations quietly fail, and it deserves more design attention than it usually gets.
Commissioning covers functional testing, transfer and changeover verification, and load bank testing at rated capacity to confirm the set performs to specification under real load rather than on paper. We issue a full test report with the recorded voltage, frequency, current and temperature readings, which is normally required for project handover.
Scheduled servicing at manufacturer intervals, covering oil and filter changes, coolant condition and concentration, fuel system and water separator, air filtration, battery condition and cranking capacity, control panel and transfer testing, and a functional run under load. We recommend annual load bank testing for any critical standby installation.
Short and long-term rental for construction projects, planned shutdowns, events, seasonal demand and emergency cover, including fuel systems, cabling, distribution and on-site support. See our dedicated generator rental page. Generator rental: 10 kVA – 3,000 kVA · minimum 1 day · fuel, cabling and on-site support included.
Engine and alternator overhaul, control system upgrades on older sets, capacity uprating, relocation, and controlled decommissioning and removal.
Talk to MHA Solutions for expert advice on Power, IT, and Security systems that fit your space. We cover Riyadh, Jeddah, Dammam, and other cities with custom plans.
.png)
An acoustic canopy encloses the set in sound-attenuating material and controls the exhaust and intake noise paths. This is what makes a generator acceptable next to a hospital ward, a hotel, a mosque or a residential block, and it is often a planning or municipal requirement rather than a preference. A canopy is not only about noise. It also protects the set from dust, sun and weather, which matters more here than in most markets.
Acoustic canopy · dust, sun and weather protection
.png)
A generator built into an ISO container or a purpose-made shelter, complete with ventilation, fuel system, control panel and distribution. Containerised sets suit remote sites, temporary installations, projects with no plant room, and large capacities where building a room around the machine is slower and more expensive than delivering it ready to run. They are also relocatable, which matters on a construction programme that moves.
Ventilation, fuel system, control panel and distribution built in
.png)
An open set on a base frame, for installation inside an existing plant room where the building provides the acoustic and weather protection. The plant room then has to do the work: ventilation sized for the heat rejection, exhaust routed correctly, and access for maintenance and eventual engine removal. We design that as part of the installation rather than leaving it to the builder.
Open set on a base frame
.png)
Smaller sets on trailers or skids for site work, temporary events, emergency cover and jobs that move between locations. These are most often rented rather than bought.
Trailer or skid mounted
.png)
Where one set cannot cover the load, or where the load must survive the loss of a single machine, multiple generators are run in synchronisation with load sharing between them. This also allows a set to be taken offline for maintenance without dropping the load — which is the only practical way to service a generator installation that cannot be shut down. Synchronisation requires proper control gear and commissioning. It is not something to add later as an afterthought.
Synchronisation with load sharing
.png)
An Automatic Transfer Switch or Auto Mains Failure panel detects a mains failure, starts the generator, transfers the load, and reverses the sequence when the mains returns. This is what turns a generator into a backup system rather than a machine somebody has to go and start. The transfer arrangement is where a surprising number of installations fail, usually because it was never tested under real load after commissioning.
ATS or Auto Mains Failure panel
Hospitals and clinics where transfer time, reliability and regulatory compliance are all non-negotiable, and where the generator has to carry life-safety and critical care loads without interruption.
Prime power for sites with no grid connection, and temporary power through the build programme. Rental usually makes more sense than purchase here, and sets need to be robust enough for site conditions.
Treatment works, pumping stations and distribution control, frequently at unmanned remote sites where reliability and remote monitoring matter more than anything else.
Process-critical and safety-related backup in high-temperature environments, with hazardous area classification driving specification where relevant.
Standby plant sized to carry the full IT and cooling load, commissioned with load bank testing, and often configured with multiple synchronised sets for redundancy.
BTS and transmission sites, often remote, often outdoors, where fuel logistics and unattended reliability are the governing constraints.
Hotels, malls and office towers where acoustic performance and municipal noise limits shape the specification as much as the electrical requirement.
Temporary power for exhibitions, conferences and outdoor events, where silent running and fast mobilisation matter.
Capacity is only the starting point. The right set for a given load depends on rating class, motor starting characteristics and the environment it will run in — but this is the shape of the range.
Typical applications: Small offices, retail units, clinics, telecom cabinets, villas, site huts
What usually drives the specification: Physical footprint and noise. Usually canopied, often single-phase at the lower end.
Typical applications: Mid-size offices, small factories, schools, construction sites, mosques
What usually drives the specification: The most common band in the Kingdom. Automatic transfer switching is standard here.
Typical applications: Hospitals, hotels, small data centres, medium industrial, water pumping
What usually drives the specification: Motor starting almost always governs sizing rather than running load.
Typical applications: Large industrial, water treatment works, large commercial developments
What usually drives the specification: Often multiple sets in synchronisation rather than one large machine.
Typical applications: Heavy industry, petrochemical, mining, major infrastructure projects
What usually drives the specification: Usually containerised or built into a purpose-designed plant room, with bulk fuel storage.
A generator's rating describes how it is permitted to be used, not just how much power it can produce. The same physical set will carry a different kVA figure depending on the rating class, and using a set outside its class will shorten its life considerably.
Designed to run only when the mains fails, for a limited number of hours per year, at a varying load. This is the correct class for a building backup generator that may run for a few hours a month. Standby-rated sets carry the highest kVA figure of the three classes and have no overload capability.
Designed to run for an unlimited number of hours at a varying load, as the primary source of supply. This is what a remote site, a construction project or a facility without a reliable grid connection needs. Prime-rated sets are more heavily specified, carry a lower kVA figure than the same machine would as standby, and typically allow a limited overload for short periods.
Designed to run indefinitely at a constant load — base load operation, or running in parallel with the grid. This carries the lowest kVA figure and the most conservative specification.
These classes are defined in ISO 8528-1, and every reputable manufacturer publishes ratings against them. The practical consequence is simple: if a supplier quotes you a headline kVA figure without stating the rating class, the quotation is incomplete. A 500 kVA standby set and a 500 kVA prime set are not the same machine at the same price.
Using a standby-rated set as a prime power source is one of the most common and most expensive specification errors we see. It works — right up until the engine reaches an early overhaul it should not have needed.
A generator's nameplate rating is quoted at reference conditions. Real installations in the Kingdom rarely match them, and the difference between the nameplate figure and the deliverable output is not small.
Engine and alternator output both fall as intake air temperature rises, because hotter air is less dense and carries less oxygen. Manufacturers publish derating curves for exactly this reason. A set specified against a nameplate figure without checking the curve against a 45°C summer ambient is not going to deliver what the drawing says it will. We size against the actual site condition, not the catalogue.
Most of the Kingdom is low-lying enough that altitude is a minor factor, but not all of it. Installations in the Asir highlands around Abha and the surrounding region sit high enough that altitude derating is a real specification input, and it compounds with temperature rather than replacing it. This is routinely overlooked, and it is the sort of thing that only shows up when the set is asked for full output.
Airborne dust is the most consistent maintenance burden on generators here. It loads air filters far faster than a temperate-climate service interval assumes, blocks radiator cores and reduces cooling capacity, and finds its way into places it should not. This drives filter specification, service intervals and enclosure design. A twelve-month service interval that works in Europe is not appropriate for an unsheltered industrial site in the Eastern Province.
Diesel does not keep indefinitely. In warm conditions it degrades over months, and where water finds its way into a tank — through condensation, poor sealing or delivery — microbial growth follows. Heat accelerates both processes. The result on a standby set that runs a few hours a year is a tank of fuel that looks fine and blocks filters the moment it is genuinely needed. Fuel treatment, water separation, periodic polishing and tank maintenance are part of a real maintenance regime, not optional extras.
On the Red Sea coast, salt-laden humid air attacks enclosures, radiators, exhaust systems and electrical terminations. An installation in Jeddah or Yanbu needs different corrosion protection from one in Riyadh, and treating the Kingdom as a single environment produces early failures.
Intake protection and shutdown philosophy both need thinking through for sites exposed to sustained blowing sand, particularly for prime-rated sets that cannot simply be stopped.
A diesel engine is designed to run under meaningful load. When a standby set is only ever exercised off-load or on a light building load — which describes most standby generators most of the time — the engine never reaches proper operating temperature and combustion is incomplete. Unburned fuel and soot accumulate in the cylinders, exhaust and turbocharger. The condition is known as wet stacking, and its symptoms are black exhaust, oil weeping from exhaust joints, falling performance and, eventually, engine damage.
The set will still start. It will still run. It simply will not deliver its rated output when the day comes that you need it.
Weekly no-load exercising, which many facilities do faithfully, does not solve this. It confirms that the engine starts. It tells you nothing about whether the set can carry its rated load, whether the alternator holds voltage and frequency under a step load, whether the cooling system copes at full output in summer, or whether the transfer arrangement actually works when it matters.
Load bank testing applies a controlled, measurable load so all of that can be verified and documented. For a critical standby installation we recommend annual testing at rated capacity, with a written report of the results. It is also a standard requirement for data centre commissioning and for handover on most infrastructure projects.
We provide load bank testing as part of our maintenance contracts and as a standalone service, with our own load banks and engineers.
We supply diesel generator sets built around Perkins and Cummins engines. Both are supported worldwide, which is the practical reason they matter: parts and service expertise are available in the Kingdom, and a set that can be maintained locally is worth considerably more over fifteen years than one that cannot, whatever the purchase price comparison said.
Engine choice is only part of the specification. Alternator quality, control gear, and how the set is built and installed determine reliability just as much as the badge on the engine. We are happy to explain the trade-offs on a specific requirement rather than simply quoting a brand.
1.4 MW generator load bank testing and thermography, 2023, SAR 300,000. Read the NEOM case study.
We supply, install, service and rent generators Kingdom-wide from our base in Jeddah — including Riyadh, Dammam, Khobar, Jubail, Yanbu, Makkah, Madinah, Taif, Abha and remote industrial and infrastructure sites. Installation, commissioning, load bank testing, scheduled servicing and emergency callouts are carried out by our own engineers on site.
Sizing depends on your total running load, the starting current of the largest motor on the system, whether the set is for standby or prime duty, and how much spare capacity you want for expansion. Motor starting is the factor most often underestimated — starting current can be several times running current, and a set sized only on running load will trip or produce a voltage dip that takes other equipment down with it. We carry out a load study before recommending a capacity.
A standby-rated set is designed to run only during a mains failure, for limited hours per year, at varying load. A prime-rated set is built to run unlimited hours at varying load as the primary supply. A continuous-rated set runs indefinitely at constant load. The same physical machine carries a different kVA figure in each class, so a quotation stating only a kVA number without the rating class is incomplete. Using a standby set as prime power is a common and expensive error.
We supply sets built around Perkins and Cummins engines. Both have established parts and service support in the Kingdom, which matters far more over the life of the installation than the difference on the purchase invoice.
Consumption is roughly proportional to load, and diesel engines are most efficient in the upper part of their load range rather than lightly loaded. Every manufacturer publishes a fuel consumption curve for the specific set at 25, 50, 75 and 100 per cent load, and that curve — not a rule of thumb — is what should drive your fuel storage sizing and running cost estimate. We provide the figures for the set we are quoting so you can plan tank capacity and refuelling logistics properly.
Yes. Acoustic canopies are standard on most of our range and are frequently a municipal or planning requirement rather than a preference — particularly near hospitals, hotels, mosques and residential areas. A canopy also protects the set from dust and sun, which extends life in Saudi conditions.
Yes. We supply and commission synchronisation and load-sharing systems for installations where a single set cannot cover the load, or where N+1 redundancy is required. Synchronisation also allows one set to be taken offline for servicing without dropping the load, which is often the only practical way to maintain an installation that cannot be shut down.
At manufacturer-specified intervals — typically expressed in running hours or annually, whichever comes first. In Saudi conditions the dust load usually means air filtration needs attention more frequently than a temperate-climate interval assumes. A service should cover oil and filters, coolant condition, fuel system and water separator, air filtration, battery cranking capacity, control panel and transfer testing, and a functional run under load.
Weekly off-load exercising confirms that the engine starts. It does not confirm that the set can carry its rated load, that the alternator holds voltage and frequency under a step load, that cooling copes at full output in summer, or that the transfer arrangement works. Running a diesel engine repeatedly at light load also causes wet stacking, where unburned fuel accumulates in the exhaust system and degrades performance. Annual load bank testing at rated capacity addresses both, and produces a documented result.
Untreated diesel degrades over a period of months, and heat accelerates it. Where water enters a tank through condensation or delivery, microbial growth follows — and warm, humid conditions make that considerably worse. On a standby set that runs a few hours a year, the result is a tank of fuel that looks perfectly normal and blocks filters the moment it is genuinely needed. Fuel treatment, water separation and periodic polishing should be part of the maintenance regime.
Yes, and it is regularly missed. Output falls as intake air temperature rises, so a set specified against its nameplate without checking the manufacturer's derating curve against a 45°C ambient will not deliver what the drawing assumes. Altitude adds a further reduction, which is minor across most of the Kingdom but genuinely significant in the Asir highlands around Abha, where it compounds with the temperature effect. We size against actual site conditions rather than catalogue reference conditions.
Send us your load schedule, a single-line diagram, or a description of the site and what needs backing up. We will arrange a survey where it is needed and return a sized specification with the rating class stated, a costed proposal, and a maintenance option.
Most facilities in the Kingdom deal with separate suppliers for power, IT and security, then discover the gaps between them at the worst possible moment. The UPS vendor points at the electrical contractor. The IT supplier says the rack was never their scope. Nobody owns the problem.
MHA Solutions covers all four disciplines with one engineering team. That means one point of accountability for the UPS, the distribution board feeding it, the server rack it protects and the access control system on the door of the room.
We work with industrial plants, healthcare facilities, government entities, data centres, telecom operators and major infrastructure contractors across Saudi Arabia. Our engineers handle the full lifecycle: site survey and load study, system design and specification, supply, installation, testing and commissioning, and ongoing maintenance under contract.
Equipment that performs well in a temperate climate does not always survive a Saudi plant room. Ambient temperatures above 45°C shorten battery life, airborne dust clogs filters and cooling paths, and salt-laden humidity on the Red Sea coast attacks enclosures and terminations. We specify for those conditions from the start, because replacing equipment early is far more expensive than sizing it correctly on day one.
Discover Our JourneyHappy customers
Brand partnerships
Years in business
Countries Served

Explore engineered solutions for mission-critical environments across power, IT and security.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.