.png)
Efficient Power Distribution Solutions
MHA Solutions supplies, installs, tests and commissions distribution transformers for industrial plants, commercial developments, healthcare facilities and infrastructure projects across Saudi Arabia. Dry-type and oil-immersed, specified against Saudi supply conditions and the actual load rather than a catalogue figure — and installed by the same team that carries out the electrical works around them. A transformer is the least glamorous item in most electrical installations and one of the longest-lived. It will typically sit in service for two or three decades, energised continuously, quietly consuming losses whether the building is busy or empty. Very little about it is adjustable after installation, which is why the specification decisions matter more here than almost anywhere else in the distribution system. Most of those decisions get made badly for the same reason: the transformer is treated as a commodity purchased on kVA and price. In practice the kVA figure is the easy part. Whether the unit is dry-type or oil-immersed determines where it can be installed and what fire protection the building needs. The loss figures determine what it costs to run for the next twenty-five years, which is frequently more than the purchase price difference between two options. The impedance affects fault levels and how the downstream protection has to be coordinated. And the ambient temperature at the installation location determines whether the unit can actually deliver its nameplate rating at all. We specify transformers against the site rather than the catalogue: the incoming supply arrangement, the actual and projected load, the harmonic content of that load, the installation environment, the fire strategy of the building, and the standards the project is being delivered to. We then install, test and commission the unit, and we carry out the switchgear, cabling and earthing work around it as one scope — so there is no gap between an equipment supplier and a separate contractor.
Load assessment including projected growth, harmonic content, ambient and installation conditions, vector group and impedance selection to suit the supply arrangement and downstream protection, and a loss evaluation where the installation runs continuously. The output is a specification you can tender against, with the assumptions stated.
Distribution, dry-type cast resin, oil-immersed, isolation and special purpose transformers. We supply across a range of ratings and voltage classes for commercial, industrial and infrastructure applications — contact us with your requirement and we will confirm availability and lead time.
Positioning and foundations, MV and LV terminations, switchgear interfacing, earthing and bonding, containment and bunding where required, and switchroom ventilation. Because we hold electrical contracting capability in-house, the transformer and everything connected to it is one scope of works rather than two contracts meeting at a boundary.
Pre-energisation testing including turns ratio, winding resistance, insulation resistance, vector group and polarity verification, and dielectric testing of insulating oil where applicable. Results are recorded in a commissioning report suitable for project handover and for future comparison.
Thermal imaging under load, connection torque checks, insulation resistance trending, cleaning of dry-type windings and cooling paths, and oil condition testing on oil-filled units. Trending results year on year is how a developing problem gets found while it is still cheap to fix.
Dielectric strength testing, moisture content, and dissolved gas analysis on oil-filled units. Dissolved gas analysis in particular is one of the most informative diagnostics available on a transformer — the gases dissolved in the oil indicate what kind of fault is developing inside the unit long before anything is visible externally.
Capacity uprating where load has grown beyond the original design, replacement of units at end of life or wrongly specified, relocation, and controlled decommissioning and removal including oil handling and disposal.
Talk to MHA Solutions for expert advice on Power, IT, and Security systems that fit your space. We cover Riyadh, Jeddah, Dammam, and other cities with custom plans.
.png)
The workhorse of any installation — stepping medium voltage down to the low voltage distribution the building actually uses. These are supplied in both oil-immersed and dry-type cast resin construction, with the vector group, impedance and tap range specified to suit the incoming supply arrangement and the downstream protection scheme. This is the largest part of what we supply, across commercial developments, industrial facilities, healthcare sites and infrastructure projects.
Oil-immersed or dry-type cast resin
.png)
Epoxy-encapsulated windings with no insulating liquid, for installation inside occupied buildings where fire strategy rules out oil. Common in basement switchrooms, hospital plant rooms, data halls, shopping centres and high-rise developments. Cast resin also stands up well to humidity and airborne dust, which makes it a sensible choice on coastal sites and in industrial environments where a VPI unit would struggle.
Epoxy-encapsulated windings
.png)
Mineral oil filled units for outdoor installation, dedicated substations and fire-rated enclosures. Better efficiency, better overload tolerance and lower cost per kVA than an equivalent dry unit, at the cost of containment requirements and oil maintenance. Hermetically sealed and conservator types are both available depending on the rating and the installation.
Hermetically sealed and conservator types
.png)
One-to-one transformers providing galvanic separation between supply and load. Used to break earth loops, reduce common-mode noise on sensitive electronic and measurement equipment, and to create separated supply systems where an earth fault must not cause a trip. Medical IT systems in operating theatres and intensive care are the most demanding application, and they carry their own standards requirements.
One-to-one galvanic separation
.png)
Where equipment voltage does not match the available supply — imported plant, specific process equipment, generator interfacing or a site fed at a non-standard voltage. Also used to correct legacy voltage arrangements in older installations.
Matching equipment voltage to the supply
.png)
A single shared winding rather than separate primary and secondary. Smaller, lighter and cheaper for a given rating where the voltage ratio is modest, but with no galvanic isolation between input and output — which rules them out for any application where separation is the point.
Single shared winding · no galvanic isolation
.png)
Converter and rectifier duty units for drives and industrial processes, earthing transformers and neutral earthing resistors, and transformers specified for high harmonic environments. These are specified against the actual duty rather than a standard catalogue rating.
Specified against the actual duty
Plant distribution, drive systems and process equipment, where harmonic content and continuous loading both drive the specification and where loss evaluation makes a material difference to running cost.
Hospital distribution and medical IT isolation systems for theatres and critical care, where fire strategy generally rules out oil indoors and where the isolation requirements carry their own standards.
Dry-type distribution inside data halls, specified for the harmonic profile of IT and UPS loads, with loss performance a genuine operating cost factor at continuous high load.
Basement switchrooms in hotels, malls, offices and mixed-use towers, where cast resin is normally the only construction the fire strategy will accept.
Treatment works and pumping stations, frequently outdoors, frequently remote, with motor-dominated loads and limited maintenance access.
Plant and substation distribution, often specified to ANSI/IEEE practice rather than IEC, with hazardous area considerations where relevant.
Distribution for transport, public buildings and development projects, delivered against the main contractor's specification and commissioning requirements.
This is usually decided by where the transformer has to go and what the building's fire strategy allows, rather than by electrical performance.
Oil-immersed transformers use mineral oil for both insulation and cooling. Oil is an excellent coolant, which means these units run cooler for a given rating, tolerate overload better, tend to be more efficient, and generally cost less per kVA — particularly at larger ratings. They also have a long and well-understood service life.
The trade-off is the oil itself. Mineral oil is flammable, so oil-filled units normally need to be installed outdoors, in a dedicated substation, or in a fire-rated enclosure with bunding to contain a leak. They also require oil maintenance: dielectric strength testing, moisture checking, and periodic filtration or replacement. Where fire risk or environmental containment is a concern, ester-filled alternatives are available with substantially higher fire points, at a cost premium.
Dry-type transformers contain no liquid. Cast resin units encapsulate the windings in epoxy, which gives good resistance to moisture, dust and mechanical damage, and a fire performance classification that allows installation inside occupied buildings — usually with no containment and no fire-rated room. Vacuum pressure impregnated units are a lower-cost dry alternative but are less tolerant of humid environments, which matters on the Red Sea coast.
The trade-offs on dry-type are real: higher losses for the same rating, physically larger, higher purchase cost, less overload capacity, and more sensitivity to dust accumulation on the windings, which needs periodic cleaning.
The practical rule most projects arrive at: if the transformer can go outdoors or into a dedicated substation, oil-immersed is usually the better commercial answer. If it has to sit inside the building — a basement switchroom, a plant room, a hospital, a data hall — dry-type cast resin is normally the right choice, and often the only one the fire strategy will accept.
Where the decision is genuinely close, the deciding factor is usually the total cost of ownership rather than the purchase price, as covered below.
Saudi Arabia runs at 60 Hz. Much of the world runs at 50 Hz, and a large share of imported electrical equipment is built accordingly. On a project where equipment is being sourced internationally on price, this is one of the most common and most expensive specification errors we encounter.
The physics is straightforward. A transformer's core flux depends on the applied voltage and the supply frequency. Operate a transformer designed for 60 Hz on a 50 Hz supply at the same voltage and the core flux rises, pushing the core towards saturation — which means excessive magnetising current, overheating, audible noise and a shortened life.
The reverse case, a 50 Hz unit operated at 60 Hz, is electrically less dangerous: core flux falls and the unit will generally run. But it is not a free lunch. The cooling design, the impedance and the loss figures were all calculated for 50 Hz, so the nameplate performance no longer applies, and the actual behaviour needs checking rather than assuming.
The practical consequences on site are familiar: a transformer that runs hotter than expected, unexplained humming, a unit that cannot hold its rating, or an approval that is refused because the equipment is not rated for the supply it is connected to.
This applies well beyond transformers — motors, generators and any equipment with a magnetic core are affected — but transformers are where it shows up most often, because they are the item most likely to be bought on price from an unfamiliar supply chain.
We specify and supply transformers rated for 60 Hz operation as standard, and where a client has already procured equipment we will check the rating before it is installed rather than after it has failed. If you are being offered a transformer at a price that seems unusually competitive, the frequency rating is the first thing worth checking on the nameplate.
A transformer has two kinds of losses, and they behave very differently.
No-load losses, sometimes called core or iron losses, occur whenever the transformer is energised — regardless of whether anything downstream is drawing power. They run twenty-four hours a day, every day, for the entire service life of the unit. A transformer energised continuously for twenty-five years accumulates a very large amount of no-load loss.
Load losses, or copper losses, vary with the square of the load. Double the load and the load losses quadruple. A transformer running lightly has low load losses; one running near its rating has considerably more.
Both losses are paid for in electricity, and both appear as heat, which in an air-conditioned building means the cooling system pays for them a second time.
The commercial consequence is that two transformers with the same kVA rating and a meaningful price difference are often not the cheaper and the more expensive option. They are the option that costs less today and the option that costs less over its life. Loss evaluation — capitalising the cost of losses over the expected service life and adding it to the purchase price — routinely reverses which unit is actually cheaper, particularly for continuously energised installations.
This matters most where the transformer runs long hours at meaningful load: industrial plants, hospitals, data centres, hotels and any facility operating around the clock. It matters least on standby or lightly loaded installations, where the purchase price genuinely does dominate.
We are happy to run a loss evaluation as part of a quotation, comparing the total owning cost of the options rather than only the invoice. On a large or continuously loaded installation it frequently changes the decision, and it gives you a defensible basis for the specification when the purchase is being challenged on price alone.
A transformer sized against a standard load figure will run hot and age early if the load feeding from it is heavily non-linear — and modern installations increasingly are.
Variable speed drives, UPS input stages, IT power supplies, LED drivers and electronic ballasts all draw current in short, distorted pulses rather than a clean sine wave. Those harmonic currents produce additional heating in the transformer windings and core, well beyond what the same magnitude of linear current would produce. Harmonic currents also circulate in the delta winding of a Dyn transformer rather than passing through to the supply, which concentrates the heating where it is least convenient.
The result is a transformer that is technically within its kVA rating and thermally overloaded. It runs hotter than design, insulation ages faster, and service life is reduced — often without anyone identifying why.
There are two normal answers. A K-rated or harmonic-rated transformer is designed and constructed to handle a specified level of harmonic content without derating. Alternatively, a standard transformer can be derated so that it is operated below its nameplate rating with the margin absorbing the additional heating.
Which is appropriate depends on how much of the load is non-linear and how heavily loaded the transformer will be. For a data hall, a facility full of variable speed drives, or a building with a large UPS installation, this is a specification input rather than a detail — and it is one of the most common reasons a correctly sized transformer nevertheless runs hot.
Where we are unsure of the harmonic profile, a supply survey settles it before the unit is ordered rather than after it is installed.
Transformer ratings are quoted against standard reference ambient conditions defined in the relevant standards. Saudi installations frequently exceed them, and where they do, the nameplate rating is not the deliverable rating.
A transformer sheds heat into the surrounding air, and its rating assumes that air is at a specified temperature. In an unventilated switchroom in Jeddah or Riyadh in August, it is not. The permitted temperature rise is fixed by the insulation class, so as ambient climbs, the available loading falls. A unit specified against a catalogue rating and installed in a hot switchroom is being asked to do something it was never rated to do, and it will age accordingly.
This is the corollary and it is regularly under-designed. A transformer rejects real heat into the room it sits in, and that heat has to leave. Natural ventilation openings sized on a rule of thumb are frequently inadequate for a Saudi summer. We size the ventilation or the mechanical cooling as part of the installation rather than leaving it to the building contractor to assume.
Along the Red Sea coast, salt-laden humid air attacks terminations, enclosures and exposed metalwork. This affects enclosure specification, protection ratings and the choice of dry-type construction — cast resin copes considerably better than VPI in these conditions.
Airborne dust settles on dry-type windings and in cooling paths, insulating exactly the surfaces that need to shed heat. It is a straightforward maintenance issue but only if somebody is actually doing the cleaning at a sensible interval.
We derate against measured or design site conditions and state the assumption explicitly in the specification, so the basis of the rating is on record.
Transformer specification on Saudi projects sits across two standards traditions, and knowing which applies to your project matters before anything is ordered.
The IEC 60076 series covers power transformers internationally and is the reference most commonly applied on commercial, infrastructure and utility-connected projects in the Kingdom. IEC 60076-11 covers dry-type units specifically, including the fire and environmental classifications that determine whether a transformer may be installed inside an occupied building.
ANSI and IEEE C57 standards follow American practice and appear on projects where the client or the operator works to that tradition. Parts of the Saudi oil, gas and petrochemical sector specify to this family rather than to IEC, and the two are not interchangeable — a unit built to one is not automatically acceptable under the other.
Beyond the equipment standards, medium voltage equipment connecting to the utility network is subject to the utility's own connection requirements and approval process, and buildings with oil-filled transformers are subject to fire and containment requirements that must be agreed with the relevant authority as part of the design.
We work to whichever standard the project specifies, and we will flag it early if the equipment being proposed does not match the standard the project is being delivered under — because that is a problem far cheaper to solve at specification stage than at inspection.
Test certificates and commissioning records are provided for every unit we supply and install, as part of the handover documentation.
We supply, install, test and maintain transformers Kingdom-wide from our base in Jeddah — Riyadh, Dammam, Khobar, Jubail, Yanbu, Makkah, Madinah, Taif, Abha and remote industrial and infrastructure sites. Installation, testing, commissioning and maintenance are carried out by our own engineers.
It is usually decided by location and fire strategy rather than electrical performance. If the transformer can be installed outdoors, in a dedicated substation or in a fire-rated enclosure with containment, oil-immersed is generally more efficient, tolerates overload better and costs less per kVA. If it has to sit inside an occupied building — a basement switchroom, a hospital plant room, a data hall — dry-type cast resin is normally the right answer and often the only construction the fire strategy will permit.
Sizing starts with the measured or calculated load plus a realistic allowance for growth, but several other factors change the answer: how much of the load is non-linear, how continuously the transformer will run, the ambient temperature where it will be installed, and the fault level and protection coordination downstream. A transformer sized on connected load alone is frequently either oversized and wasteful or undersized and running hot.
Yes, and it is one of the most common procurement errors we see. Saudi Arabia operates at 60 Hz while much of the world operates at 50 Hz, and a great deal of imported equipment is built for 50 Hz. A transformer designed for 60 Hz and operated at 50 Hz will run towards core saturation, with excessive magnetising current, overheating and noise. The reverse case will generally run but no longer matches its nameplate performance. Always check the frequency rating on the nameplate, particularly on competitively priced imported equipment.
An isolation transformer has a one-to-one ratio and its purpose is galvanic separation rather than voltage change. It breaks earth loops, reduces common-mode noise reaching sensitive electronic or measurement equipment, and allows a separated supply system to be created where a single earth fault must not cause a disconnection. Medical IT systems in operating theatres and intensive care are the most demanding application and carry their own standards requirements.
Frequently, yes. Transformer ratings assume a standard reference ambient temperature, and the permitted temperature rise is fixed by the insulation class. In an unventilated switchroom during a Saudi summer, the actual ambient is well above the reference figure, so the loading the transformer can carry without exceeding its temperature limit falls. Switchroom ventilation is the other half of the same problem and is regularly under-designed. We derate against actual site conditions and state the assumption in the specification.
The most common causes are harmonic content in the load, inadequate switchroom ventilation, high ambient temperature, dust accumulation on dry-type windings blocking heat transfer, or loose terminations creating localised heating. Non-linear loads such as variable speed drives, UPS systems and IT power supplies produce additional winding and core heating well beyond what the same magnitude of linear current would cause. Thermal imaging under load will usually identify which of these it is.
A K-rated or harmonic-rated transformer is constructed to handle a specified level of harmonic current without needing to be derated. You should consider one where a significant proportion of the connected load is non-linear — data halls, facilities with many variable speed drives, or buildings with large UPS installations. The alternative is to specify a standard transformer and derate it so the spare capacity absorbs the extra heating. Which is more economical depends on how much of the load is non-linear and how heavily loaded the unit will be.
Annual inspection is a reasonable baseline for most installations, with more frequent attention in dusty industrial environments or where the unit is heavily loaded. A dry-type transformer needs cleaning of windings and cooling paths, thermal imaging under load, connection torque checks and insulation resistance testing. An oil-filled unit additionally needs oil dielectric testing and moisture checking, and dissolved gas analysis is worth doing periodically on important units.
Dissolved gas analysis examines the gases that have dissolved into the insulating oil of an oil-filled transformer. Different internal fault mechanisms — overheating, partial discharge, arcing — produce different characteristic gases, so the analysis indicates not only that something is developing but what kind of problem it is. It is one of the few diagnostics that sees inside a sealed transformer, and it will often identify a developing fault long before there is any external sign.
Yes. Load growth beyond the original design is one of the most common reasons for replacement, along with end of service life, units that were wrongly specified originally, and fire strategy changes that require oil-filled units to be replaced with dry-type. We assess the existing installation, confirm what the switchgear, cabling and switchroom can accommodate, and handle replacement, relocation and decommissioning including oil disposal.
Send us your load schedule, single-line diagram or project specification, along with where the unit will be installed. We will confirm the construction type, rating and standard that suit the application, and quote with the specification assumptions stated — including a loss evaluation where the installation warrants one.
Most facilities in the Kingdom deal with separate suppliers for power, IT and security, then discover the gaps between them at the worst possible moment. The UPS vendor points at the electrical contractor. The IT supplier says the rack was never their scope. Nobody owns the problem.
MHA Solutions covers all four disciplines with one engineering team. That means one point of accountability for the UPS, the distribution board feeding it, the server rack it protects and the access control system on the door of the room.
We work with industrial plants, healthcare facilities, government entities, data centres, telecom operators and major infrastructure contractors across Saudi Arabia. Our engineers handle the full lifecycle: site survey and load study, system design and specification, supply, installation, testing and commissioning, and ongoing maintenance under contract.
Equipment that performs well in a temperate climate does not always survive a Saudi plant room. Ambient temperatures above 45°C shorten battery life, airborne dust clogs filters and cooling paths, and salt-laden humidity on the Red Sea coast attacks enclosures and terminations. We specify for those conditions from the start, because replacing equipment early is far more expensive than sizing it correctly on day one.
Discover Our JourneyHappy customers
Brand partnerships
Years in business
Countries Served

Explore engineered solutions for mission-critical environments across power, IT and security.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.
Engineering reliable infrastructure for critical facilities.